Electrical Installation Complete, All Installation Complete

May 18, 2004 by · 4 Comments
Filed under: Solar Energy 

The electrician is here working today.

UPDATE: It’s all done.

Inside the Basement

Wall Before

This is the wall in the basement before anything.

Wall Blank

This is the blank wood before installation of components.

Inverters Open

The inverters (top) and DC disconnect switches (bottom) are installed.

Inverters Almost Done

Here are the inverters with their covers on, and the switches partially wired.

Inverters Complete

Here’s the completed installation in the basement. The inverters are actually running in this photo, though the sun is on the opposite side of the house and it’s a little cloudy – so we’re only getting about 1000 watts right now.

Inverter Label

This is the label from the side of one of the inverters.

Your cheap cialis professional beloved partner will surely appreciate this. Men suffering from erectile dysfunction are very happy and satisfied than they were before the usage of this buy cialis cialis pill. viagra no prescription fast look at this website To aid this, there are specific drugs intended for these conditions. Since you know the causes and preventions click for more now levitra generic vardenafil of this disease. Electrical Panel Open

Here’s the open electrical panel, showing the new breakers at the bottom on both sides.

Electrical Panel Done

Here’s the completed panel, including warning label.

Outside at the Meter

Outside 1

This is the initial installation of the wires. The conduit was installed last week and just extended into the house today (he did a really nice job there). The yellow wires are A/C in and out of the exterior disconnect switch for the utility’s use.

Disconnect Switch 1

Here are the disconnect switches partially installed.

Outside 3

Here is the completed product – utility disconnect switches – outside (except for required labelling).

Disconnect switch 2

And here are the required labels on the disconnect switches.

All work is complete! YAY! The system is operating in test mode until we get the local inspection (probably in about a week). Then, we apply for the PSE&G interconnection approval, which apparently can take as long as 6 weeks. The system will be turned off between the inspection and PSE&G approval.

The meter REALLY DOES turn backwards. We had to turn off the Air Conditioner to make it happen with the little bit of sun today, but tomorrow we’ll be selling electricity all morning.

Some of the Components

February 3, 2004 by · 1 Comment
Filed under: Solar Energy 

It’ll be a few weeks before we get the permits. I’ll try to provide interesting information in the meantime to keep you interested.

Sharp’s JH-3500U is the inverter that we are using (we’ll have 2 of them). This inverter has been in use for 8 years in Japan, and was recently introduced to the US. This is a grid-connected inverter with no backup capabilities – if utility power fails it shuts down. Here is the PDF spec sheet.
One sale of viagra must try something else, as one cannot take medications whole life. generic cialis professional It does not get strength to penetrate and show its effect over sexual arousal. It’s often fast find content viagra 100 mg and an order can be placed using a credit or debit card from the comfort of your home. This means there free samples cialis greyandgrey.com should be some form of foreplay in order to increase the blood circulation in the body.
Sharp’s NT-185U1 is the solar panel that we are using (we’ll have 36 of them). This panel is also new, and is the top of the Sharp line at the moment. This is the PDF spec sheet for the panels.