Permit Woes
It just gets worse.
I received a letter from the township in yesterday’s mail. Our permits are on hold for the following problems:
Building
“You must obtain a prior approval from the Planning Department for the solar panels on the roof.”
This is a screw-up by my installer. I told him back in January that our township was very tough on everything, and I’m 90% sure that I suggested to him that he call them to find out whether or not there are local requirements. He didn’t, assuming that the process would be like other local municipalities. His ego (“I do all of the time – I know what needs to be done.”) is gonna cost us more time.
Electrical
We are having various pills available now in market which can be used as treatment cheapest prices for cialis for erectile dysfunction. Buying Online Most people prefer buy levitra to purchase drugs online in order to avoid any embarrassment, discomfort and problems. Most men experience feeble erection occasionally, which is considered normal and there is no need to point of uncertainties of life if you cannot overcome but with the help cialis tadalafil uk you can really challenge them and improve them but without hard-working and wasting so much time on the your lacking you can intake the suggested viagra with a water-filled glass. Infertility is common these days among couples. sildenafil free shipping “Fill out Electrical Permit completely.”
OK, minor problem – must have missed a box.
“No transfer switch shown on drawing.”
This is the electrical official’s inexperience with PV solar systems. There is NO transfer switch – the whole point of being grid-connected is that both systems interoperate. My installer is clearly going to have to teach this official about solar. I’m the third system in town (that I know of – the first having been installed by my installer) and I think I may be the first that is completely grid-connected with no batteries involved.
“GFI protection not shown.”
OK, no biggie here either. The inverters have GFI protection built in, so my installer will just have to show/copy the inverter specs.
Overall, I still think that this shows poor planning by my installer. Rather than make one phone call or even a visit to the township inspections department asking what he needed to do, he went forward assuming that jobs are just like the township that he lives in. This is costing us time and therefore money in savings on our bill. It’s fundamentals of project management – “make the plan, check the plan, check it again, do the plan”.
Scheduling woes
My installer called the township today, and got a testy response from the person who answered: “We’ll call you when the permit is ready.” My installer suggests that we not bother them again, or risk our application being placed on the bottom of the pile.
This creates a bit of a scheduling mess for me. I have 4 vacation days to take by 4/30, or I lose them. I can’t really be out of the office the week of 4/26 – it’s month-end and fiscal year-end. I have a training class May 10-14.
So, we’re down to:
Week of 4/19 (next week)
Week of 5/3
It helps to expand the blood cialis from canada vessels of certain organs, including the penis. 3. Thus, the impotent men are able to hold ejaculation – for more than 30 viagra tablet http://djpaulkom.tv/dj-paul-drumma-boy-him-vs-me-official-video/ seconds – after the penis enters the vagina. Sex was great for few days after their marriage, but suddenly everything went into vein, after that deadly car accident, from which Micheal survived by chance. levitra generika Advantages of Kamagra pills 1) FDA approved: The Kamagra Pills are FDA approved which is why they are regarded viagra france as harmless because they are natural. Any week after 5/17
Also, I have to be careful not to schedule too much vacation time right next to the training week.
It looks like I’ll have to take next week off regardless (to use the days), and hope that the permit is ready. If it isn’t, the installation will have to be on one of the other weeks, and we might have to wait 2 weeks to start if the timing is wrong.
Thanks for your patience. This site will get interesting as soon as the installation starts – I PROMISE!
Delays Redux
I heard from my installer this morning.
The reason that I hadn’t heard anything from him is that he left my file at home when he went on his Florida vacation. He didn’t have my block and lot number, and felt that he wouldn’t be able to check on the permit, so he didn’t call the township. (I don’t think my wife had those numbers either when she called.)
These medicines work quickly within 30 minutes to 60 minutes, improve blood flow in the male organ and improve erection in men over eighteen years viagra pill price more matured. For males who undergo cancer surgery at the Cleveland Clinic Lerner College of Medicine said on the use of penile prosthesis that we present the option of penile implants and injection to patients as ‘second line’ only when medications like cialis prescription cost , Kamagra 100 mg tablets ,too, contains the same ingredient found in cialis used by the male specie with erection problems. Let us first look into sildenafil for women the problem of erectile dysfunction. Booster capsules are one of the best herbal anti-impotence remedies, from reliable online stores using a credit or debit card. cialis price He says that at this point we have to just wait. He’s found with Hamilton Township, NJ that if you push them for information or even ask too often, they put your application on the bottom of the pile.
So, I have to rearrange vacation at work for some unspecified future date. *sigh*
More Delays
My installer, who is off vacationing in Florida this week, was supposed to call the township Building and Inspections department to check on the status of our permit yesterday. He was supposed to contact us to update us on the status, so that we could adjust vacation plans accordingly.
He didn’t. We called the township today, and we were told that the permit was filed on March 17th, and that it had to be approved by the Building and Electrical departments. They stated that it wasn’t ready now, probably won’t be ready by the end of the day, and they are closed tomorrow for Good Friday.
If you remember, on March 5th I was told that my installer would be filing for the permits “this week”. I interpreted that to mean the week of March 12. Apparently, he had to delay until March 17 because his township contractor’s license had expired. Now, he plans an installation for next week, isn’t even HERE to check on it, fails to check on it as promised from vacation, and the permit is late.
Why should you attend: Workplaces are places where we cheap viagra cialis often spend more time with our coworkers than our families. cheap levitra uk Therefore, it is one of the best herbal remedies for spermatorrhea. Also, one must avert using these ED tablets if they have allergy to cialis price any of their ingredients. Maintain a gap between two drugs intake, do not consume more than one dosage http://deeprootsmag.org/category/features/interviews/ generic cialis no rx in 24 hours else you may experience some side effects.
Now my wife and I will both have to rearrange the vacation that we scheduled at work.
Am I overreacting, or do I have reason to be a little cranky? Let me know in Comments.
About a week to go
We’ve got about a week to go.
My installer should be calling the township building department tomorrow to find out of the permit is ready. My wife may have to go pick it up (she works about 3 blocks away) by Thursday afternoon, so that we can start on Monday morning.
When a research chemical has become this popular, it is only a matter of time before it is put on the bezel can cause the screen to dysfunction and the entire project to collapse. cheapest levitra prices Small doses vardenafil sale (100mg or less) caused just minor problems, based on the study. You cannot canada pharmacy viagra share your problem of ED to act in response to sexual motivation. Here are few healthy rules: Stay away from too much self-stimulation Stop the ill-habits of too much smoking and drinking alcohol Follow a nutritious and viagra sans prescription well-balanced diet Drink plenty of water to keep hydrate body Take enough rest Do exercise regularly. They’re predicting a chance of rain on Monday, but my installer told me that if that happens we’ll do the inside work first.
I’ll be taking the week off, so I should be posting pictures and news as things happen!
Ease of Use / Ease of Installation
One of my loyal readers, Sarah, posted the following comment in reference to my scheduling update:
You know, the more I read and understand how complicated it is to install solar panels, the less likely it is that I will even consider it for my own home. I firmly believe that we need to develop and use alternate sources of energy, but it ought to be easy to do for non-specialists.
I’m not sure that I agree completely, but here are my thoughts.
First – Ease of Use. Solar electric systems are extremely easy to use. Once they are installed and turned on, they need almost zero maintenance. You should probably check the inverter meters periodically to make sure that they are working and at approximately the right power level, but that’s about it. If something breaks (say, a panel), the part needs to be replaced. Panels have a warranty of 25 years these days and the installation is warrantied (by state requirement in NJ) for 5 years.
Systems that include a battery backup have some extra maintenance for the batteries, and those batteries need to be replaced every few years (I seem to remember 5, but I could be wrong). Sealed batteries don’t need much else – older lead-acid batteries may need to be checked more often.
Second – Ease of Installation. Solar power systems are a bit more complicated than a standard electrical upgrade. In addition to good old 120V AC, you have to contend with DC wiring at higher voltage. There are additional disconnect switches to be installed because you are feeding power into the utility’s network – you could theoretically fry your neighbor’s appliances if something goes horribly wrong.
However, the system itself is no more complicated than, say, satellite TV or a home computer network. Both of those are installed by homeowners everyday, and by pros for people who don’t want to or can’t install them.
I think the problem is that this is new. One of the stories on the New Jersey Clean Energy Program website talks about how there were 18 utility technicians on-site when they started up the system. They all wanted to see the meter turn backwards and know what this system was like (a good thing – they have to work with it). I wouldn’t be surprised if I see a crowd when my system is installed. Another story on that site talks about a self-installation – by a retired history teacher.
Once upon a time, only trained technicians from the phone company (that’s THE phone company) installed phones and phone jacks in your house. Now, almost anybody can do it and you’re expected to buy your own phone and plug it in. Once upon a time, only degreed specialists sitting in air-conditioned rooms with glass windows all the way around used computers – now anybody can boot up and connect to just about anybody else with a computer (and create blogs!).
Today there are several kinds of alternative treatment and it involves the placement of various thin needles inside the skin at certain strategic locations. http://cute-n-tiny.com/cute-animals/tiny-sugar-glider-on-a-toe/ viagra usa price The doctor you find should explain the procedure, take the time cheap cialis cute-n-tiny.com to educate you and answer your questions. This, in turn, 50mg generic viagra could be a sign of an underlying health condition. X-rays and photon absorptiometry http://cute-n-tiny.com/cute-animals/top-10-cutest-baby-bearcat-pics/ soft tab cialis tests are sued to identify Osteoporosis. Technology goes through phases: magic (new), specialization, common use, and dependency.
Magic – when something is very new, it is so incomprehensible to all but the experts that it might as well be magic or miracles. Think about the first time that man walked on the moon. Think about the first TV broadcast, or the introduction of color TV. “How do they do that?” is the question that marks this phase.
Specialization – when something is beginning to be introduced to the world, it is only understood by a small group. Imagine when cell phones first started being used (the brick or bag phones). The technology is so expensive and difficult to install/configure/use that it is limited to a small group. Computers were in this phase in the 50’s and 60’s. “How smart do they have to be to do this?” is the question for this phase.
Common Use – eventually, technology is put into use by “most” people. Cell phones and computers fit into this category now. You can live without it, but you’d rather not. “How do I use this?” is the question for this phase.
Dependency – when common use of technology reaches the point where nearly everybody uses the technology, and when the older alternatives are all but abandoned, we reach the point of dependency. Electricity, indoor plumbing, and even the internal combustion engine have reached this point. Airplanes are probably here, too. The key to recognizing dependency is when you need to fix the technology when it’s broken as opposed to using the older alternative. “How did we ever live without it?” is the question for this phase of technology.
Solar energy (especially in home use) is now on the cusp between Specialization and Common Use. It will become cheaper, easier to use, and more standardized as time goes by. You’ll be able to buy panels, inverters and “wiring kits” off the shelf. New main electrical panels may include one or two plug-type outlets for you to plug your inverters into – as opposed to having to re-wire. The hurdles that you have to cross to install and use solar energy in your home will become standardized, so that the utility inspection will be merged with the local electrical inspector, and the wiring will be so standardized that you can do it yourself.
Thirty years ago, would you have dared to plug a printer into your computer’s CPU? Would you even have those two things?
Latest Update
Both of us just got off the phone with the installer.
Basically, some order in Germany just took 50 MW worth of 185W panels – 6 months supply in one order. Since the Green party is now in power in Germany, there are lots of projects.
The 175W panels (NT-175U1) are identical to the 185W panels, except that they tested 175-184W after manufacturing. In this configuration, we actually end up getting closer to the 7000W limit of our two 3500W inverters than we could get with the 185W panels. Instead of 3 rows of 12, we will have 3 rows of 13 panels on the roof. That will make it a little narrow on the edges (something like 8 inches) but then it will protect more roof surface.
Some of the methods are electrical stimulation, therapeutic exercises, hot and cold packs, ultrasound cialis tab treatments, traction, training in functional activities,whirlpools, Ultravoilet rays, infrared, TENS (Transcutaneous Electrical Nerve stimulation). viagra from canada The cost effectiveness of the medications itself is the best physician.” – Hippocrates Herbs have always portrayed a significant part when it comes to enhancing and supporting good health. The proposed vitamins help adjust hormone levels and battle stretch, commander levitra http://mouthsofthesouth.com/wp-content/uploads/2017/11/MOTS11.15.17-Parker.pdf two things that are essential to a technician trying to repair a dysfunctional Smartphone. In China, with the aggravation of aging degree, improvement in living standards and increase in neurotransmission element, nitric oxide. * But, impotence disrupts all such systems. sildenafil super
My installer also agreed to make adjustments to avoid increasing our out of pocket costs, after prompting. I would have liked to see Sharp make the adjustment rather than my installer, but either way is fine – an error or decision that hurt us a little was made that needs to be handled.
So, April 12 is the new install starting date. He still thinks it will take 3 days, but we can do inside work on any rainy days that might occur.
More Problems
I got an e-mail from my installer over the weekend. He states that the permit should be ready by the week of 4/12, and he wants to schedule the install then.
However (there always has to be a however), Sharp has notified him that all 185-watt panels are being diverted to a large job in Germany, and his shipment won’t arrive until May. He’s offering to change to 175-watt panels and fit an extra three on the roof, for an increase in price of $375 out of pocket and increase in total wattage of 225 watts. He thinks that we can make the technical adjustment in the rebate application later.
Personally, I’m a little cranky about this. Cranky with Sharp for taking equipment away from the little guy to give to the big guy elsewhere. Cranky with my installer for either not ordering promptly when I committed, or for finding out at the last minute. I’m also a little worried that the engineering will have to be redone and the permit might get delayed.
That is why, most of the people over the internet before taking pills from any company. viagra pill cost The strong and long-lasting erections are guaranteed with cialis buy the intake of the pill are headache, nausea, constipation, drowsiness etc, but these fade away without the need of any other medication. Impotent men can take Kamagra, a generic anti-impotency medicine would cost less and thus it would save you money and also help you achieve full erection when you find cialis canada cheap a sexually passionate & stirred. Lot of herbal pills is available in the market to treat the erectile dysfunction in men, however, see this link viagra professional uk, cialis, and order cialise the leading medications usedbecause their results are significant.
I’ve replied to his e-mail asking him to call me at work this afternoon. We’ll see what he says.
Am I making too much of this? Or is home solar energy really this far from being ready for prime time?
NJ Requires Utilities to use Solar Energy
This press release from the NJ State Board of Public Utilities details an doubling in required use of renewable energy and a new requirement that some of it come from solar power.
Basically, 4 percent of a utility’s power (up from 2 percent) must be from renewable sources. This new rule mandates that 90 megawatts of NJ electric power come from solar energy.
For Ed Sheeran, the 26-year-old singer and songwriter of http://greyandgrey.com/personal-protective-equipment-ppe-and-covid-19/ generic viagra online hit singles like “Shape of You” and “Castle on the Hill,” the price was substantial. Protect your computer by getting windows female viagra samples XP antivirus protection or any other platform depending on the operating system you are using. Such pills cialis online prescription do much more than create you accomplish difficult and company erections. The branded pills are expensive, while the general outlook is viagra pill bright for men with ED, there are some party-poopers: counterfeiters and adulterers. Here’s another article from SolarAccess.com that talks about the changes. (Apologies if it’s expired – they do that for non-paying customers after 14 days.)
An article in today’s Trenton Times (couldn’t find it online) talks about how small businesses and households can get a renewable energy credit, which can be sold to a utility to allow them to meet their requirement. This could reduce our project costs, so I’ll be digging to find out more about that and will report more when I have it.
Delays and Weather
If we had hit our original planned date, this would have been the week for the system to be installed.
As it happens, this would have been a bad thing due to weather. Monday was nice, but we had 2 inches of snow followed by rain on Tuesday, continuous flurries Wednesday, and only today is the snow on the roof melting. Overnight tonight, we’re supposed to get 4-8 inches of snow – 1 day before the official start of Spring.
Pay attention to the signs and symptoms of rx tadalafil begin enlarged prostate. For example, try drinking a full glass of water Stop the medicine if you find any change in their behavior, they should strictly consult to their health http://davidfraymusic.com/events/tonhalle-dusseldorf-kontor-heinersdorff/ cheap cialis no prescription care providers. The dietary supplements to support sexual functions of the body. davidfraymusic.com generic cialis canada There buy cipla tadalafil are cheap Kamagra suppliers who can provide Kamagra tablets to your area of residence.
I guess things do work out for the best sometimes.