Inspections

May 25, 2004 by · 1 Comment
Filed under: Solar Energy 

Today, we are scheduled for inspections by the township building department, and the NJ Clean Energy Program. The township inspection is required before filing the PSE&G Interconnection Agreement and before the NJ Clean Energy Program will release the rebate to my installer.

Stay tuned for results!

UPDATE: 10:15am – the Building Inspector has come and gone. He approved us. He used to work for my company a long time ago. He was really interested in the whole solar thing so I gave him the nickel tour.

UPDATE #2: 11:15am – the Electrical Inspector has come and gone. His first question was “Where’s the transfer switch?” (there is none – and he inspected another system a few weeks ago nearby.) I explained the function of the system, showed him the original electrical drawing, and the inverter manual. I think he decided that he didn’t know as much as my installer and approved us. The yellow permit card has now been removed from the window.

I’ll be filing the PSE&G interconnection agreement this afternoon.

UPDATE #3 5:00pm – The NJ Clean Energy Program inspector was here a few minutes ago. He also passed us. He did a more thorough inspection than the township inspector – actually counted the panels, checked the DC voltage at the DC disconnect switches, and turned off the exterior A/C disconnect switches to see the meter speed up (it was running forward).

I mailed the PSE&G interconnection agreement paperwork today at the post office – they should receive it on Thursday. My installer estimates a 6-week wait for the new meter and the ability to turn the system back on again – for now it will sit dormant.

Township Inspection Scheduled

May 19, 2004 by · Leave a Comment
Filed under: Solar Energy 

The Township inspection has been scheduled for next Tuesday, May 25. My installer will be trying to schedule the state BPU inspector to come the same day (or he might just choose not to inspect).

After that, the PSE&G paperwork goes in, which might take as long as 6 weeks. It might be mid-July before we’re truly live full-time.

UPDATE: The State BPU inspection is scheduled for the same day. The inspector will be coming by on his way home out of Trenton – we’re conveniently located!