Installation Summary

On May 25, 2004 the installation of solar panels on our house in Hamilton, NJ was completed.

Solar Installation Complete - angled shot

This index lists all interesting entries for this project. Click the links below to go directly to that article.

The System We Chose (Jan 28, 2004) (NOTE: Some technical details changed later.)

A Little About Us (Jan 28, 2004)

How It Will Work (Jan 29, 2004) (NOTE: We ended up not using a sub-panel.)

Some of The Components (Feb 3, 2004) (NOTE: We ended up with the 175-watt cousin of the 185-watt panels mentioned here)

BEFORE PICTURES (Feb 8, 2004)

Switching Panels (“Latest Update”) (Mar 29, 2004)

Permit Delays (“More Delays”) (Apr 8, 2004)

Permit Woes (Apr 17, 2004)

Township Permit Issues (“Yet Another Update”) (Apr 23, 2004)

Permit in Hand! (Apr 29, 2004)

INSTALLATION Day 1 (May 3, 2004) – PICTURES – setup

There is no cause of alarm as such but the use of microwave shall be discontinued immediately and it shall be switched cialis for sale uk off without wasting time. Read good books, listen to appalachianmagazine.com commander cialis soothing music before going to bed. In addition to kamagra medicines there are other medications which help men in fighting impotency. viagra canada overnight appalachianmagazine.com So, generic Apcalis became the best option for guys like http://appalachianmagazine.com/2016/05/21/lets-make-america-white-again-flier-distributed-at-w-va-youth-event/ soft viagra pills me. Homeowner’s Insurance and PV Systems (May 3, 2004)

INSTALLATION Day 2 (May 4, 2004) – PICTURES – rail installation

INSTALLATION Day 3 (May 5, 2004) – PICTURES – roof wiring

INSTALLATION Day 4 (May 6, 2004) – PICTURES – most of the panels

INSTALLATION Day 5 (May 10, 2004) – PICTURES – last panel, wiring conduit

INSTALLATION Day 6 (May 18, 2004) – PICTURES – inside electrical, installation complete

Final Cost Roundup (May 20, 2004) – includes payback information

Inspections (May 25, 2004) – township and NJ Clean Energy Program

Phone Line Installation (Jun 8, 2004)

New Meter Installation (Jun 10, 2004) – PICTURES

Final Approval (Jun 14, 2004)

Reading the Meter, PSE&G Billing (Aug 4, 2004)

Jersey Solar, LLC – A Review (Aug 27, 2004)

In addition to those entries, there are many other “still waiting” entries, entries about other people’s installations, and entries containing my thoughts on solar energy topics. You can most easily find those by choosing an Archive month link at the left.