Installation – Day 3
Today, a few “getting ready” steps occurred before the panels were installed.
Holes were drilled in the mounting rails for brackets and wires.
The ground wire was installed, linking the rails. The rails will eventually be tied to the house ground in several places.
The brackets for the panels were installed in the rails, to be relocated when the panels are installed.
Tomorrow, they expect to install panels.
This is the house on day 3. Note the wires and brackets sticking out of the rails.
This picture shows a close-up of the rails and wires. The loops of wire are loose and we’re about to get a thunderstorm – I hope they stay on the roof!
I believe that the copper-colored wires are the ground, tied to the rails underneath the rail.
More to come tomorrow!
Comments
Tell me what you're thinking...
and oh, if you want a pic to show with your comment, go get a gravatar!