More Status Updates

March 5, 2004 by
Filed under: Solar Energy 

I had an e-mail exchange with my installer earlier this week. My wife had a question or two as well.

He stated that he would be picking up the electrical and construction sealed drawings from his engineer last Friday, and would apply for the permits this week. After an exchange, I determined that installation should be the first or second week of April. That’s not exactly the middle of March as originally anticipated, but I had planned for something like this to happen.

My wife (the engineer) also asked him for a copy of the drawings. She wanted to review them and make corrections (if any) before the permits were applied for (it’s easier to fix it now than it would be after the permit is issued). His reply was that a complete set of plans comes with the installation.
low price cialis This is on the grounds that all the organs become re-active for the further use. And since these ingredients are all natural and are made from herbal extracts, they are much safer, having absolutely zero side effects, unlike prescription medications like buying cheap cialis appalachianmagazine.com. In the long term, viagra online purchase toxins accumulate and affect your metabolism. Make sure that you educate yourself on the right wholesale cialis price position can help greatly in increasing and improving the size & quality of your erection.
His e-mails were … a little terse and maybe even testy. Like he didn’t want to be bothered by the customer. I think he needs to work on that.

More when I hear it!

Comments

Tell me what you're thinking...
and oh, if you want a pic to show with your comment, go get a gravatar!