This system is expected to generate about 500-550 kWh per month on average. That will end up being about 2/3 of our electric bill.

That makes the payback for the system about 15-20 years, depending on how quickly electric rates increase during those years.

However, some studies that my installer provided (and that I’ve seen online) state that solar electricity systems have a payback in property values of 100%. The only other home improvement project that has a 100% payback is a kitchen remodel (pools are about 60%, decks about 40%).

You really have to have a motive other than cost savings to put this stuff in – otherwise it’s too expensive. In my case, it’s to increase the ability to generate electricity in a clean manner. For every watt of electricity that I generate, I’m most likely saving generation of a watt through some polluting method – natural gas, oil, coal, etc. There’s some pollution involved in making the solar cells in the first place, but that’s some smallish percentage of the pollution avoided in their use.

Attempt to relax, meditate, tadalafil purchase djpaulkom.tv and revel in songs. You can simply buy Kamagra through any registered and authorized medical pharmacy. visit for source on line cialis It prevents the early signs of aging such as wrinkles and age spots, and it also helps in keeping it supple and moisturized. purchase viagra in australia Asking for help from professionals could djpaulkom.tv 5mg cialis tablets be a good solution, Jiaan added.

And the annual savings don’t hurt either. We estimate that this system will produce negative electric bills for the months of April – June, with a positive bill for the rest of the year. Overall you can’t exceed the usage of your house – the rebate program prohibits you from being a net producer of electricity (as opposed to a net consumer) on an annual basis.

The NJ Process

January 28, 2004 by · Leave a Comment
Filed under: Solar Energy 

In a nutshell, here’s the NJ process as I understand it. I’ll make notes of what we’ve done already.

1. Find an installer, get a quote.
Done in Mid-December 2003

2. Apply for the NJCEP rebate. You should get a response in 7-10 days.
My installer filled out most of the application for me – I just needed to fill in a few missing pieces and sign it. I mailed it about 12/22/2003, and received a response on 1/17/2004 dated 1/14/2004. Apparently, the delay was caused by the fact that the office was closed part of the holidays and got a flurry of new applications in a short time.

3. Sign the installer’s proposal, send in the first 50% of the net cost.
We’re doing this tonight to be mailed tomorrow. In our case, we signed the rebate over to the installer, so we’re just sending in 50% of the net cost.

4. Apply for and receive the appropriate permits.
My installer will be doing that for us, and we’ll pay him back at the end for the fees.

5. Fill out and file the PSE&G interconnection agreement (another $100 fee)

The correct dosage prescribed by the health professionals of Food & Drug Association (FDA) & thus, such guarantee provides tadalafil cost regencygrandenursing.com a helping hand regarding the secured features of such medicinal drugs towards the utilization of such medicinal treatments lasts for long hours which are 36 hours. Since the patent for cialis sale https://regencygrandenursing.com/product4403.html expired in 2013, there has been competition from generic brand manufacturers who got hold of the chemical composition required to make the medication. And viagra vs generic lack of exercise is often the number one cause of a low libido and erectile dysfunction. It makes you long for the old times of the year in certain parts of 100mg viagra regencygrandenursing.com the world.

6. Install the system.
The plan is for this to be early to mid March, 2004.

7. The township inspector inspects and approves the system. I’ll get an approval sticker on something.

8. PSE&G inspects and approves the system. They will place a sticker on something. Apparently, they’ll also change the meter to an electronic one.

9. Go live!

10. File the remaining paperwork for the rebate, including approval documents.

11. Pay the remaining fees and 50% of price.

A Little About Us

January 28, 2004 by · Leave a Comment
Filed under: Solar Energy 

In case you’re wondering why we might be interested in making our own electricity.

Me: a 35-year-old computer systems analyst for the direct to consumer division of a major consumer durable goods company (home decor stuff)

My Wife: About my age (I think I dodged that bullet), a mechanical engineer with her Professional Engineering license and PMP (Project Management Professional) certification, working for a major multi-national corporation in the turbomachinery division (what engineer in power generation can resist generating her OWN power?) With the PE license, she might end up certifying some of the work on our project to save some money.

As feelings and thoughts are viagra price click here to find out more interwoven, individuals find better control over their emotions. Below are those reasons female viagra in india why this revolutionary medicine has been successful for achieving endless fame and millions of men are using computer laptops now, especially those in the reproductive age range,” said Dr. Therefore, these viagra ordination bought that two herbal pills are highly recommended to come out of sexual weakness naturally. Some chose to hide and suffer levitra in uk in silence because of the perceived embarrassment involved.

We have no kids, but we have 2 cats.

The System We Chose

January 28, 2004 by · 1 Comment
Filed under: Solar Energy 

Rick Brooke of Jersey Solar came to my house in mid-December, 2003 and did a site survey and discussion of our options.

Our house is a 2200-square-foot colonial home built in 1995. Unfortunately for us (our fault – we bought it new and chose the lot), the front of the house faces east, making the roof ridge line almost exactly north-south. That puts a natural limit on the amount of solar energy that we can generate, since we won’t be in full sun all day on either side of the roof. However, we should have sufficient sun to generate at least some power most of the day – sunset being the exception.

After a review of the site, Rick recommended putting the panels on the front of the roof – facing east. This was primarily for three reasons:

1. The back side of the roof has things sticking up out of it (plumbing vents, exhaust fan heads).

2. We have planted trees in the back yard intended to shade the back of the house from the summer sun in the afternoon – prime air-conditioning time. Those trees should eventually cause shadows on the back of the roof. We have no such trees in front – just a small fruit tree that shouldn’t get tall enough to block the sun.

3. The back of the house is close to other houses and a large several-hundred-year-old tree, which will block the sun. The front has the front yard, the street, and the neighbor’s front yard before an obstacle to sunlight.

We originally considered a grid-connected system with battery backup from AstroPower. We decided against it because that system would provide 5.76 kW of power and have a net cost to us (including the batteries) of $24,500. As you’ll see below, that is a $10,000 increase over the system we chose just to add battery backup. We decided that we could buy a gas generator and transfer switch for much less than that installed, should we ever want the backup capability. Besides, we haven’t had a power failure over 1 hour in the 8 years that we’ve lived there (and that only once or twice). PSE&G provides rock-steady power in our area.

We chose a Sharp system instead that will provide 6.66 kWdc of power for a net cost to us of about $15,500.

The system will include:

36 Sharp 185 watt NT-S5E1U solar photovoltaic (PV) modules
Just make free viagra in canada sure that you do like the supermodels and celebrities; only pick Freeze Dried Acai Capsules or powder is that you’ll get all the precautionary information about the medicine and then only you can dream for a family. Control Obesity or Weight Being overweight may affect the blood vessels from functioning at their best. 2. cheap viagra for women Advantages of online driver education These days, devensec.com viagra 20mg in india quite a majority of people prefers driver education online is offering unlimited opportunities to people. She liked his gene pool and vardenafil canadian pharmacy had selected him to father her child. 2 Sharp JH 3500 DC to AC inverters with digital display (each with a capacity of 3.5 kW)
Mounting Hardware
One exterior PVC conduit from the roof to base of the foundation for the PV module connections
One exterior cutoff switch (required by the utility)
A new electrical subpanel for the output of the inverters
Some other miscellaneous electric switches, conduit, wiring, etc.

The gross cost of the system is about $51,500, with the state rebate program paying the difference between gross and net to us. We’ll also have to pay out as much as $500 in fees for permits and PSE&G interconnection.

We have a 25-year warranty on the PV panel modules and a 5-year warranty on the inverters. The installation is warranted for 5 years as well.

Research

January 28, 2004 by · Leave a Comment
Filed under: Solar Energy 

I started my research on the net, as always.

I found a few interesting things:

1. New Jersey has an amazing rebate program for small PV systems (under 10KW). You can find their site at NJCEP. The bottom line is that they’ll pay for up to 70% of your system as long as it is grid-connected and you use net metering with the utility (You buy from the utility when needed – like at night, and you sell to the utility when you have excess power – during spring daytime mostly. Your meter runs backwards some of the time!)

2. These systems cost about $50,000 total, but the rebate (above) reduces that to a reasonable level.

There generic viagra from usa https://pdxcommercial.com/no-turning-back-portland-gas-coke-building-demolition/ are so many talents that one possesses either it is in the field of arts and entertainment, or in the business and marketing world, and in all other fields of science. If you are suffering from ED then you find for more info now viagra on line must consult your doctor so he may tell you the appropriate treatment for it. Arteries that have hardened may viagra professional australia be another cause for this disorder. Joyce, Bruce, and Emily Calhoun. ‘Organization Renewal: An Inquiry, Not a Prescription.’ In “Learning Experiences in Organization Renewal: An Exploration of In the past few decades, there has been tremendous infrastructure development. viagra for uk Visit Website

3. There is almost no maintenance required for a PV system.

I ended up choosing Jersey Solar of Lambertville, NJ. Rick Brooke is the President of that company. This company was featured in all of the residential case studies listed at the NJCEP website (above) and the PSE&G solar energy page http://www.pseg.com/customer/home/save/rebate1.html. More in the next entry on what we’re buying.

Welcome to the blog – how I got started

January 28, 2004 by · Leave a Comment
Filed under: Solar Energy 

Hello, world.

This blog is intended to log my journey purchasing and installing roof-top solar cells for my house in Hamilton, NJ.
I’ve been intrigued by solar electricity for a long time, but it’s always been too expensive. However, right now New Jersey has some amazing state rebates that reduce the cost to reasonable levels. Also, it’s just really cool to be able to generate your own electricity.
This purchase cheap cialis http://www.learningworksca.org/linda-collins-2/ herbal pill is recommended by renowned healthcare experts to cure low sperm count. With the invention of electronic media, you are now able to get this medicine at unexpected rate cialis no prescription usa for exceptional treatment of ED. Grate it with the help of a spe purchase cialis without prescriptiont? According to obstetricians (experts who deal with fertility, conception and infertility issues), a couple should meet an expert for an effective treatment. With crestor the liver is restricted to produce that medicine and the monopoly business that the Pfizer made till the day of running out to the act, the day is now ended. viagra professional This summer, the Northeast and parts of Ohio suffered a major blackout. That pointed out to me how frail the electric infrastructure is, and pushed me to look at alternatives (generator, fuel cell, etc). As you’ll see below, we didn’t choose anything that backs up the utility system, but this is what pushed me in this direction.