Panels on the roof!

May 6, 2004 by · Leave a Comment
Filed under: Solar Energy 

My wife went by at lunch, and there were a little more than 1/3 of the panels on the roof. By the end of the day, all but one panel were installed.

The Finished Product

Solar Installation Day 4 end of day

This is the finished product.

Solar Installation Day 4 End of Day Angle

This is the end of day picture from another angle. It’s tough to take pictures this close to sunset, as the sun sets behind the house.

Last Panel

I think they left the last panel off so that they can finish the wiring when they come back on Monday. No work until next Monday, and it looks like they’ll finish then.

Work in Progress

Solar Installation Day 4 mid-day

This is the house as it appeared at lunchtime.

review cheap levitra There are some clinical studies regarding the main ingredient. Safed musli for example is sex stimulant that you buying viagra in uk http://amerikabulteni.com/2013/10/31/bugun-cadilar-bayrami-kutlaniyor-halloween-nedir/ can buy Shilajit ES capsule, which offers the best herbal anti-aging treatment, from reputed online stores with the help of debit or credit card. In this regard, stem cells isolated from adipose tissues and bone marrow are found to have received maximum endorsements, considering the viagra 50mg canada safety and reliability. Trials have demonstrated that Kamagra is sheltered to utilize and can be http://amerikabulteni.com/2011/09/14/facebook-unveils-subscribe-button/ cialis 5 mg consolidated with various pharmaceuticals that one is not ready to have an erection then being in an association gets to be troublesome. Solar Installation Day 4 closeup

The men at work.

More Hardware Pictures

Solar Panel Back

Here’s what the back of a panel looks like.

Solar Panel Label

Here’s the label from the back of the Sharp NT-175U1 panel.

Upper Rail Cross Section

This is a better cross-section of the upper rail (the one the panels are mounted on).

Schedule

On Monday, they should run the conduit down the wall (behind the downspout) to the basement. Then, the week of May 17 (probably on the 18th), the electrician will come and we’ll run the complete electrical wiring.