More Delays

April 8, 2004 by · 1 Comment
Filed under: Solar Energy 

My installer, who is off vacationing in Florida this week, was supposed to call the township Building and Inspections department to check on the status of our permit yesterday. He was supposed to contact us to update us on the status, so that we could adjust vacation plans accordingly.

He didn’t. We called the township today, and we were told that the permit was filed on March 17th, and that it had to be approved by the Building and Electrical departments. They stated that it wasn’t ready now, probably won’t be ready by the end of the day, and they are closed tomorrow for Good Friday.

If you remember, on March 5th I was told that my installer would be filing for the permits “this week”. I interpreted that to mean the week of March 12. Apparently, he had to delay until March 17 because his township contractor’s license had expired. Now, he plans an installation for next week, isn’t even HERE to check on it, fails to check on it as promised from vacation, and the permit is late.
Why should you attend: Workplaces are places where we cheap viagra cialis often spend more time with our coworkers than our families. cheap levitra uk Therefore, it is one of the best herbal remedies for spermatorrhea. Also, one must avert using these ED tablets if they have allergy to cialis price any of their ingredients. Maintain a gap between two drugs intake, do not consume more than one dosage http://deeprootsmag.org/category/features/interviews/ generic cialis no rx in 24 hours else you may experience some side effects.
Now my wife and I will both have to rearrange the vacation that we scheduled at work.

Am I overreacting, or do I have reason to be a little cranky? Let me know in Comments.