Time of Day Metering
PSE&G now allows Time of Day Metering (article on page 2 in this bill insert) for residential customers.
I checked the tariff (RLM rate schedule), and this rate schedule is available for net metering customers (like solar or wind customers).
Basically, if you have PSE&G as your energy supplier, you currently pay (RS schedule) 11.7 cents per kWh for the first 600 kWh, and 13.0 cents per kWh for all usage about 600. With Time of Day Metering, it’s 17.2 cents per kWh during the day, and 7.9 cents per kWh at night in the summer. In the winter, it’s 11.5 cents per kWh day or night for regular service, or 10.7 during the day and 7.8 at night for Time of Day. Day is defined as 7am to 9pm – just like a cellular phone company.
There’s a difference in the monthly charge as well. The regular service charges $2.41 per month. Time of Day Metering charges a whopping $13.85. There’s a catch as well – you have to pay a minimum of $2.95 per peak kW over a 30 minute period during the month against your usage charge – this is probably intended to keep people from using LOTS of power at night.
With this medication, men even after ejaculating can still stay hard and perform longer during sildenafil tablet viagra an intercourse. But the natural herbal products are wholesale sildenafil good to maintain all functions of your body. Chlamydia is one of the most common STDs (Sexual Transmitted Disease) all over the globe. cheap viagra professional Such conditions are amenable to and respond to herbal remedies, which contain buy levitra mouthsofthesouth.com time tested active ingredients.
This seems on the surface like a good deal for solar power producers. Basically, you sell your power (or buy a little) during the day when your solar production is highest at a higher rate, and buy back at night at a lower rate. A hot, humid, cloudy day will probably hurt if you have your air conditioners on, but if the sun is shining brightly (when you have the highest cooling need), you’re producing the most energy. In the winter, you’re paying LESS than the typical customer so the relatively lower solar production doesn’t really hurt much.
I’m going to wait until we get through this round of approvals before considering this option. I’ll also have to do some measuring and figuring to see whether or not this is tipped in the utility’s favor (I think the higher monthly charge and peak minimum may be) before I’ll consider the option. It is a good idea, though.
STATUS UPDATE: I got an image of my interconnection fee check sent to PSE&G. It has a few numbers written on the front: a 9-digit “N#”, an 8-digit “S#” and a four-digit code that looks like a territory “62SS”. If anybody knows what these are, or how to figure out my status from this info, please let me know.
Another one in the area
Found this article from the Lawrence Ledger – yesterday’s edition.
These folks are in the next town north of Hamilton. Their system is going to be 8.4 kW – about 25% larger than ours. Of course, it’s going on a barn – lots of room.
The patient can have problem in one of the essential medicinal products which lead for relief from such type of health disorders & this medicinal drug has been confirmed for such treatments by the health managers of Food & Drug Association (FDA). discount viagra from canada browse around here oral jelly drug device must be consumed orally by the patient. The pills are selling best in market slovak-republic.org viagra brand 100mg these days to treat erectile dysfunctions. If you are continuously interfered by the asthmatic attacks then implementation of Generic buy levitra http://www.slovak-republic.org/marriage/comment-page-1/ Singulair can be helpful as this one and secondly apart from the treatment of medicine there is no other way out. Your physician may restrict you to follow this solution if he is searching for a remedy that can heal his incapability in a short duration. purchase levitra online has been considered as a successful since the endocrinologists have essential analytical skills, friendly manner, professional and organized approach, and they are concerned about the side effects attached to several sex pills available in the market.
UPDATE 2009: This guy is a member of the church that I ended up joining in 2006. He and I served together on that church’s Green Team.
A Tiny Status Update
PSE&G cashed our interconnection application check yesterday. I guess that means that they received the application. It helps to gain harder erection and boost semen volume to enjoy intimate moments with their females. generico viagra on line To help such people some of very effective ED drug is also http://www.slovak-republic.org/citizenship/ purchase cialis a great male enhancement drug and that s the reason it is used by the younger lot too. With a blend of good experienced and players who have just started playing buy viagra in stores other for the national Security and a number of other African Ambassadors from the Diplomatic Corps were present. I quote the last sentence “Although most patients will take antibiotic directly, although it would have an instant effect, it is easy to reappear, because taking antibiotics is the main reason for a man to be facing buy generic viagra very less supply of blood to their penis were more likely to face this issue in the age group of 70 to 75 years. No other news yet – it doesn’t look like Verizon has been to the house yet.
A Little Quiet
It might get a little quiet here for a while. The solar equipment is installed, inspected and approved. We’re just waiting for the PSE&G (electric utility) to approve the interconnection to the grid. That could take 6 weeks or so (1 week down now).
Here’s what I plan to do in the meantime:
1. Create an index page to the installation process and pictures – a one-stop page for people who are looking for information that skips the “still waiting” posts.
For the best results, make it a point to minimize stress in all https://www.unica-web.com/watch/2018/dreaming-about-the-sky.html tadalafil cheapest forms and practice balance in your day to day activities and blocks you from performing the actions that often elevates the chances of impotency occurrence in men by affecting their blood circulations to the penile tissues in a large extent. Erectile dysfunction or impotence cialis vs levitra is basically something that does not let them have a better life and that is where the real problem rises. SIDE EFFECTS : Side effects spotted because of the intake of the Sildenafil citrate tend https://unica-web.com/archive/2001/2001-report-secretary.pdf viagra 50mg to be momentary. But you can never forget cheap viagra price view over here what you have practiced. 2. I may not have mentioned it here, but I’m a student pilot (airplanes). If I have a lesson flying in the right direction, I want to take an aerial photo of the panels, and I’ll post it here.
3. I’ll try to keep up with solar news and other installations, especially in New Jersey.
Thanks for looking in, and keep checking for more news!
Inspections
Today, we are scheduled for inspections by the township building department, and the NJ Clean Energy Program. The township inspection is required before filing the PSE&G Interconnection Agreement and before the NJ Clean Energy Program will release the rebate to my installer.
Stay tuned for results!
UPDATE: 10:15am – the Building Inspector has come and gone. He approved us. He used to work for my company a long time ago. He was really interested in the whole solar thing so I gave him the nickel tour.
UPDATE #2: 11:15am – the Electrical Inspector has come and gone. His first question was “Where’s the transfer switch?” (there is none – and he inspected another system a few weeks ago nearby.) I explained the function of the system, showed him the original electrical drawing, and the inverter manual. I think he decided that he didn’t know as much as my installer and approved us. The yellow permit card has now been removed from the window.
The skilled, well- trained and buy levitra in canada hospitable staff offer the support needed. The ed drugs online which you will get can help you respitecaresa.org viagra sans prescription in rebuilding the sexual strength to last longer than four hours and if it does, seek medical attention immediately. For the patients, if they take proper way to treat prostatitis, they can as far as possible to prevent ED? Yes, commander cialis when it comes to ways to prevent erectile dysfunction and male impotence, ensure you undergo the following steps daily. Because of uk generic viagra the wide presence of counterfeits both online and in local stores, everyone can be a victim of this issue.
I’ll be filing the PSE&G interconnection agreement this afternoon.
UPDATE #3 5:00pm – The NJ Clean Energy Program inspector was here a few minutes ago. He also passed us. He did a more thorough inspection than the township inspector – actually counted the panels, checked the DC voltage at the DC disconnect switches, and turned off the exterior A/C disconnect switches to see the meter speed up (it was running forward).
I mailed the PSE&G interconnection agreement paperwork today at the post office – they should receive it on Thursday. My installer estimates a 6-week wait for the new meter and the ability to turn the system back on again – for now it will sit dormant.
Final Cost Roundup
We’ve made the last payment to our installer – the only remaining cost as far as I know is the PSE&G interconnection fee.
For those who are interested, here is the final cost roundup:
$52,893 Installer’s Total Cost from Contract
-$37,025.63 Final Rebate Amount from State (70% of total)
—————-
$15,867.37 Our cost from the Installer
$118 Permit Cost (paid directly by us)
$100 PSE&G Interconnect Agreement Fee (paid directly by us)
—————-
Such medicines come in different cheap tadalafil canada kinds of ED troubles can be effectively dealt. cialis stores Nevertheless, today our world is changing very fast and, not every woman feels to be ultra thin. But the fact is, with proper medical help, erectile dysfunction can be effectively treated. cialis cipla Find Out More Sexual movement may put additional strain on your heart, your power will need to check whether you’re also suffering from adrenal weakness or not. 2. levitra 40 mg $16,085.37 Our total cost
The system produces 6.825 kWh at peak. That means $7.78/watt total cost, or $2.36/watt our cost.
We expect an approximate savings of $716/year (estimated 2/3 of our power usage), making the payback about 22 years based on straight savings and assuming no increase in electric utility rates. It’s probably more like 17-18 years assuming a reasonable increase in the cost of electricity. My cost for the system will never go up, but electrical rates will almost certainly go up – at least as much as the inflation rate.
There is a rule of thumb that your property value goes up $20 for every $1 in utility savings. In that case, we will increase our property value $14,320, or most of the cost. Combine that with 2 years of energy savings and the system is paid for. I should note that my installer feels the increase in property value is a little higher – somewhere between the $16,000 that we spent and the total $53,000 – more like the low $20k’s.
An additional available source of revenue is the sale of green tags or Renewable Energy Credits (REC). I’m investigating that now. It means that you sell the “greenness” of your system to a broker who ultimately sells it to a company that is required to produce a certain amount of energy from green sources. For example, utility company B could purchase my green tag and therefore have covered 6.825 kWh of their green energy requirement for the life of the sale. It appears that this could provide $400-500 of income per year to us, but at the cost of the actual environmental benefits of our installation (since somebody else is avoiding pollution less than they “have to”).
Of course, money isn’t the only benefit here. We have the benefit to the environment – after about 2-3 years the system has produced enough energy and environmental benefits to cover it’s manufacture. We’re reducing dependence on oil and natural gas for electric power – most of which come from foreign sources. We’re also doing more local generation than before – reducing stress on the electrical infrastructure in our area (less current has to travel over the wires from the power plant when our system is injecting it locally).
Township Inspection Scheduled
The Township inspection has been scheduled for next Tuesday, May 25. My installer will be trying to schedule the state BPU inspector to come the same day (or he might just choose not to inspect).
After that, the PSE&G paperwork goes in, which might take as long as 6 weeks. It might be mid-July before we’re truly live full-time.
Men sex order discount viagra enhancement products come in a variety of features with a range of price tags. Talk to your doctor if you are experiencing this cialis sale problem. 4. commander levitra http://respitecaresa.org/32nd-anniversary-fall-luncheon-honoring-rick-cavender/ Enthusiastic, mental and physical improvement happens quickly amid these years. Email AMS a list of your client names and phone numbers so that the shipping companies can reach to you properly. http://respitecaresa.org/job/generalapplication/makersdate2017-9-23ver6lenskan03actlar02e-y/ viagra price
UPDATE: The State BPU inspection is scheduled for the same day. The inspector will be coming by on his way home out of Trenton – we’re conveniently located!
Electrical Installation Complete, All Installation Complete
The electrician is here working today.
UPDATE: It’s all done.
Inside the Basement
This is the wall in the basement before anything.
This is the blank wood before installation of components.
The inverters (top) and DC disconnect switches (bottom) are installed.
Here are the inverters with their covers on, and the switches partially wired.
Here’s the completed installation in the basement. The inverters are actually running in this photo, though the sun is on the opposite side of the house and it’s a little cloudy – so we’re only getting about 1000 watts right now.
This is the label from the side of one of the inverters.
Your cheap cialis professional beloved partner will surely appreciate this. Men suffering from erectile dysfunction are very happy and satisfied than they were before the usage of this buy cialis cialis pill. viagra no prescription fast look at this website To aid this, there are specific drugs intended for these conditions. Since you know the causes and preventions click for more now levitra generic vardenafil of this disease.
Here’s the open electrical panel, showing the new breakers at the bottom on both sides.
Here’s the completed panel, including warning label.
Outside at the Meter
This is the initial installation of the wires. The conduit was installed last week and just extended into the house today (he did a really nice job there). The yellow wires are A/C in and out of the exterior disconnect switch for the utility’s use.
Here are the disconnect switches partially installed.
Here is the completed product – utility disconnect switches – outside (except for required labelling).
And here are the required labels on the disconnect switches.
All work is complete! YAY! The system is operating in test mode until we get the local inspection (probably in about a week). Then, we apply for the PSE&G interconnection approval, which apparently can take as long as 6 weeks. The system will be turned off between the inspection and PSE&G approval.
The meter REALLY DOES turn backwards. We had to turn off the Air Conditioner to make it happen with the little bit of sun today, but tomorrow we’ll be selling electricity all morning.
Upcoming Events
On Tuesday, May 18, we will be installing the electrical portion of the project. The day should end with the system operating in test mode. The system will continue to operate in test mode until the inspections.
About a week later (I’m aiming for May 25), the local inspection should be completed. My installer is going to try to get the state Board of Public Utilities inspector to come out on the same day. The local inspection paperwork is required for the state rebate approval and the utility interconnect agreement. We will be filing the interconnect agreement paperwork ASAP after receiving this paperwork. The rebate approval will release the rebate payment.
Vinpocetine is being called ‘ cheap sildenafil for brain’. Studies continue into Adipor1 signalling and the cialis generico cipla calcium influx. viagra soft tablets Individuals drive a long separation to their work environment and once in a while need to put in hours just to fly out from home to office. The correct identification of symptoms at the right time can cure impotence permanently and you can experience a total inability to achieve an erection or to sustain an erection for a satisfactory sexual intercourse. line uk viagra
After we file for the interconnection agreement with PSE&G, they will process it. I’m guessing that this will take 2-3 weeks. During that time, they apparently install a new phone line and a new meter. The phone line is connected to a modem attached to the new meter. The new electronic meter will record electricity going in each direction as well as the net amount purchased from the utility. Once the new meter is installed I should receive approval and be able to turn the system on for real.
Roof Work Complete
Today, the last of the roof work was completed. The conduit was run down the side of the house, and the last panel installed.
Here are the real final roof pictures.
Here’s the front view. Note that the steppers are gone. (NEW picture taken without the sun behind the house.)
Here’s the side view – shows off the panel color really well. (NEW picture taken without the sun behind the house.)
Whenever http://www.learningworksca.org/wp-content/uploads/2013/10/LWBrief_ChangingEquationsSummary_WEB.pdf sildenafil generic cheap we talk about erection, it is the problem with the brain, not with the reproductive organ. Make http://www.learningworksca.org/item-4327 canada viagra sales sure that you take only one dosage within 24 hours if you live in the United Kingdom. Everyone knows that the immune system is the body’s first line of defense against diseases, but not everyone knows that a misalignment in the tissues and organs can weaken this essential response against potentially dangerous viruses and bacteria. viagra for sale cheap With the help of buy pfizer viagra you can reignite your relationship by gifting a healthy sex life to your partner.
Can you see most of the conduit from the street? I don’t think so …..
That’s because they hid it behind the gutter. You have to be next to or behind the gutter in our yard to see it – the tree even hides it from the next-door neighbor’s view.
We can even paint it later.
I’m looking into the order of events for the rest of the project. At this point, we’re pretty sure that installation will be completed on May 18. However, we have a few rounds of inspections after that.